As-Builts

As-Builts

Final Record Drawings (referred to in the industry as “As-builts, record-drawings,As-Build,Existing condition drawings):

The contractors are often forced to change the bid or contract drawings due to complications during construction. These changes or variations made during construction are recorded in the As-built drawings. It documents for the contractors the current dimensions and layout of the the structure and show the conditions AS-IS.

These changes need to be clearly indicated.The title block for the drawings shall include the name of Contractor and, if applicable, the name of the Consultant who prepared the drawings.

The purpose of the Contractor Project Record Documents is to record the actual placements of the rebars on the projecT. It records any and all changes due to Change Orders, Modifications, approved Shop Drawings, field directives, and other approved changes.

These are collectively referred to as “Project Record"

We at Ontario provide the As-Built for Rebar jobs completed, at the end of the project.Each record copy shall bear

  1. The legend & quot
  2. PROJECT RECORD COPY-- will contain the following data:

Contractors Name_______________________________

Contractor Address____________________________

Made by______________________ Date______________

Checked by__(Contractor’s Agent) Date______________

We at Ontario Make Sure ------------

  1. Approved changes in the Work, either by Change Order or field directive.
  1. Details not shown in the original Contract Documents.
  1. All relocations of Work for Rebar
  1. All changes in dimensions.
  1. All access doors.
  1. As applicable for the project, such information shall include, but shall not be limited to:
  1. Footing depth in relation to finished grade elevations.
  1. All changes in floor elevations.
  1. All structural changes.
  1. All substitutions.
  1. Elevations and locations of all underground utilities, services, or structures referenced to permanent above-ground structures or monuments.

FREE REVISIONS

-- Revisions are included in the price, if due to errors and omissions of Ontario Steel Detailing.

-- Revisions due to RFI, Bulletin,Sketches, etc ( not included)FREE CONSTRUCTION SUPPORT

-- We hold your hand during the project and provide support whenever required.

-- We provide support to the extent included in the scope of work provided by us